You enter it once
Circuits, switchboard, material list, proposal and documents come from one project. You change things in one place.
You enter the same data in four places. Site notes, a circuit spreadsheet, a switchboard drawing and a proposal. Every change means corrections everywhere.
Lengths from routes on the plan
A material list with EAN codes, ready to import at the wholesaler. You buy what you need.
Cable lengths are estimated. A missing cable or protection device shows up at the wholesaler or during installation.
The switchboard lays itself out
Devices and phases are distributed automatically. Click a circuit to see its path to the supply and any errors.
The switchboard is checked in your head. Phase distribution, connections and device labels are set by hand, with no second pair of eyes.
Documents from the project in one click
Device labels, single-line schematic, proposal and PDF documentation with your logo.
Documentation late at night. Labels, the schematic and the switchboard description are done last, while the client waits for the handover.
You work offline
You save the building, rooms and circuits without internet access. Changes are sent automatically when the connection returns.
No signal on site. In a basement or an unfinished building, an online app cannot save data, so it is back to pen and paper.